BUILDING TECHNOLOGY 1 [ARC 3514]- Project 2 – Industrialised Building System

Learning Outcomes

1. Identify and collect relevant research data.
2. Evaluate existing construction system and detailing of the selected project.
3. Critique issues pertaining to construction principles, materials, techniques, process of assembly and detailing.
4. Critique issues pertaining to energy efficiency, embodied energy as well as ecological impact.


First, we identified and performed a case study on an apartment which was constructed partially using IBS method.

 Background study of the building/project including the IBS manufacturer/supplier and

identify the parts of the building which were constructed using IBS.

 Identify all the IBS components used including appropriate sizes, etc. and to indicate clearly the location of each component.
 Identify all the connections and joints between different IBS components i.e.: columns and beams, etc.




 Group Photo after Site Visit @ SP Setia Casting yard :)














Video presentation of the case study, model making process as well as the embodied energy calculation